Greenfield vs brownfield analysis
Both look at where your distribution centers should be. A greenfield analysis starts from a blank map. A brownfield analysis starts from the sites you already have. Most network studies benefit from running both.
| Greenfield | Brownfield | |
|---|---|---|
| Starting point | A blank map | Your current DCs |
| Question it answers | Where would DCs go if we started over? | Which of our sites should we keep, and which could we close? |
| Data needed | Customer locations and demand | Customer locations and demand, plus your DC locations |
| Typical use | Entering a new region, a new business, checking how far demand has moved | Consolidating after a merger, closing or adding a site, lease renewals |
| What you get | The ideal locations for your demand | The best network you can build from the sites you have |
Greenfield analysis
A greenfield analysis ignores existing buildings and places DCs as close as possible to your demand. Each customer counts in proportion to how much it buys. The answer shows the ideal footprint for the business you have now, or the one you forecast.
It's the right first step when you're entering a new region or building a network from scratch. It's also useful as a benchmark: if the ideal locations are far from your current sites, your demand has moved. For the full method, see how to do a greenfield analysis for a new distribution center.
Brownfield analysis
A brownfield analysis works with the network you already run. You mark the DCs that must stay open, mark the others as optional, and choose how many DCs you want. The analysis keeps the required sites and works out which optional sites to keep and which to close so the network stays closest to its demand.
This fits decisions that start from real buildings: consolidating two networks after a merger, deciding which lease not to renew, or testing whether one more site would help.
Why run both
The greenfield answer is the ideal. The brownfield answer is the best you can do with what you have. Score both in demand-miles (each customer's demand multiplied by its distance to the nearest DC). If the brownfield network is close to the greenfield one, your sites are well placed. If the gap is large, a move or a new site is worth studying in detail.
Running both in Greenfield Analysis
- Greenfield: upload customer locations and demand, choose how many DCs to place, and compare DC counts on the DC Scenarios chart.
- Brownfield: include your current DCs in the upload. Pin the ones that must stay open, leave the rest optional, and set the number of DCs you want.
The online demo includes a greenfield example on US data and a brownfield example on EU data.
Need more than siting? Both analyses here measure distance to demand. To weigh freight rates, facility costs, capacities, plants and inventory together, and then simulate the plan, use SCModeling from the same team.
See both on sample data
Run the greenfield and brownfield demos in your browser before you upload your own network.